Atendemos a todo Brasil

Grupo Ibrace
Escritório Campinas

Rua Maestro Francisco Manuel da Silva, 71
Campinas – SP – 13080-190 

E: comercial_ibrace@grupoibrace.org.br
T: (19) 3578-0100

Grupo Ibrace
Escritório Brasília

SRTV/Sul Quadra 701 Ed. Centro Empresaria Brasília, Bloco A, Salas 701/705 – Asa Sul
Brasilia – DF

E: comercial_ibrace@grupoibrace.org.br
T: (19) 3578-0100

Nosso laboratório trabalha no sistema 24h/5d, temos atendimento ao cliente para o acompanhamento do projeto em horário comercial.

Certificações AnatelCertificação de Produtos – Testes e Ensaios Laboratoriais.

Urgent: Anticipation of the approval code-ANATEL

ANATEL has identified some requests on the use of the pre-approval code by means of the SGCH system. A survey was carried out in the SGCH database and observed that there are thousands of provisional requirements whose codes were anticipated.

Considering the characteristics of the new certification and type-approval system, we are informed that the code for the approval of the provisional requirements of the SGCH for those requirements which are re-registered in the new system will be carried out. Mosaic and have the billet paid up to the day 31/03/2017.

In order to be able to carry out the binding of the approval code, the OCDs should follow the following procedure for those products which the applicant wishes to keep the approval code anticipated by the SGCH:

1-Register a new CCT in the SCH, with the documentation relating to the anticipated approval code.

2-The OCD should enter in the other field a document requesting the binding to the early approval code.

3-In the "File description" field of the above document, the phrase: Request for binding of approval code is written.

4-A new type-approval code will be generated. This will be changed later.

5-Guide The applicants to enter the documentation also referencing the anticipated code.

When receiving these requirements, ORCN will carry out the evaluation, for those requirements that meet the previous criteria, as if the approval code were the anticipated code. After analysis of the fulfilment of any requirements, the application shall be approved and initially the approval code shall be the new code. Only after approval will the exchange for the anticipated code be carried out.

We remain in the mood!

Post a comment